Steel and cementitious panels
Welded steel shells filled with a cement core for offices and technical rooms that need a quiet, solid floor under foot and good load spread between pedestals.
Raised access floors · technical flooring
Pisomad USA plans, installs and maintains raised access floors: modular panels set on adjustable steel pedestals, with the space underneath kept free for power, data cabling and conditioned air.
Every job starts from the same question: what has to run under the floor, and what load has to stand on top of it. The panel, the pedestal and the finish follow from that.
Welded steel shells filled with a cement core for offices and technical rooms that need a quiet, solid floor under foot and good load spread between pedestals.
Adjustable heads set the finished height and take up an uneven slab. Stringers tie the grid together where the floor carries racks or heavy rolling loads.
Panels with an open grille or perforations placed in front of equipment, so cooled air from the underfloor plenum reaches the racks that actually need it.
Outlet boxes and grommeted openings cut where desks and equipment will stand, so power and data come up through the floor instead of across it.
High-pressure laminate, vinyl, carpet tile or static-dissipative surfaces, chosen for how the room is used and how often the panels will be lifted.
Rocking panels, worn edges, missing pedestal heads and floors that were opened and never closed properly are brought back to level and to a tight fit.
A raised floor pays off wherever the layout of a room changes faster than the building does.
Cabling and cooled air share the plenum, and any panel can be lifted to reach them.
Desks move, floor boxes move with them, and nobody chases a wall or a ceiling.
Consoles fed from below keep the working area clear and the cables protected.
Benches and equipment can be rewired for a new layout over a weekend.
Most problems with access floors are decided at the planning stage, long before installation day.
Small repairs and full rooms follow the same order. Only the length of each step changes.
We measure the room, check the slab and note everything that has to pass under the floor or stand on top of it.
You receive a drawing of the grid, the panels and the finish, with a written quote and a schedule.
Pedestals are set out and levelled, the grid is built and the panels are laid and cut around the room.
We walk the floor with you, check for rocking panels and leave the lifter and the layout drawing behind.
The things people ask before they commit to a raised floor.
Often, yes. Work can be split into zones so part of the room stays usable while the rest is built, and live equipment is planned around rather than switched off.
It depends on what goes underneath. Cabling alone needs a shallow void; air distribution needs more. The survey settles the height before anything is ordered.
In most cases. We identify the panel and pedestal system first, then replace or re-level what is worn, and tell you plainly if a section is not worth saving.
No. Nothing is sold or paid for here. This site has no checkout and never asks for card, bank or document numbers.
Tell us about the space, what runs under the floor and roughly when you need it. We reply in writing with what a survey would cover.